Roller Compacted Concrete Projects

Project: Shawnee State Forest Dam Improvements
Location: Portsmouth, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: ODNR Department of Engineering
Contractor: Lodebar
Construction: May, 1999 - June, 1999
Tons Mixed: 15,148
Description: Project consisted of placing RCC on the downstream slope of three different dams with in the Shawnee state park then covered with topsoil.
Project: Mills Pride Door Factory
Location: Elmira, NY    USA
Owner: Mills Pride Door Factory
Engineer: Excel Construction Services
Contractor: SSS & Fahs Rolston Paving
Construction: June, 1999 - July, 1999
Tons Mixed: 13,500
Description: PEI Mixed RCC for Concrete Materials Company owned by Dennis Super with SSS, Fahs Rolston Paving did the laydown, job was actually in Sayre, PA just over the state line from Elmira, NY
Project: 4th Street Low Water RCC Dam
Location: Ft Worth, TX    USA
Owner: Tarrant County Regional Water District
Engineer: Tarrant County
Contractor: Craig Olden, Inc.
Construction: August, 1999 - September, 1999
Tons Mixed: 20,620
Description: Dam was built instream for flood control and created a upstream recreational lake.
Project: Atlanta Road Dam
Location: Marietta, GA    USA
Owner: Paces Properties
Engineer: Schnabel
Contractor: Thalle Construction
Construction: October, 1999 - November, 1999
Tons Mixed: 3,805
Description: Project was constructed for a storm water detention basin to mitigate increased runoff from a new development
Project: Glendale Landfill Levee Improvements
Location: Glendale, AZ    USA
Owner: City of Glendale
Engineer: Earth Tech
Contractor: Valley Rain Construction
Construction: November, 1999 - January, 2000
Tons Mixed: 90,480
Description: Project mixed soil cement and placed it along the Agua Fria River bank protecting the landfill from flood waters.
Project: Lake Tholloco Dam Repair
Location: Ft Rucker, AL    USA
Owner: U.S. Army Corp Of Engineers
Engineer: Law Gibb Group
Contractor: Thalle Construction
Construction: February, 2000 - June, 2000
Tons Mixed: 52,600
Description: RCC was used for an emergency spillway repairing this breached dam from overtopping and bringing it into current dam safety guidelines.
Project: Saddle Lake Dam Improvements
Location: Tell City, IN    USA
Owner: USDA Forest Service
Engineer: FSMS
Contractor: T-C Inc.
Construction: August, 2000 - September, 2000
Tons Mixed: 18,750
Description: RCC was used for an emergency spillway and overtopping protection abutment walls were built from formed RCC TC's first RCC job 
Project: Thomas Dam Rehabilitation
Location: Thomas, WV    USA
Owner: City of Thomas
Engineer: Civil Tech Engineering
Contractor: Alwood
Construction: September, 2000 - October, 2000
Tons Mixed: 4,147
Description: RCC was placed against the downstream side of an existing concrete dam as an abutment . Bringing the dam up to current dam safety standards.
Project: Black Rock Dam Rehabilitation
Location: Zuni, NM    USA
Owner: Pueblo of Zuni
Engineer: GEI
Contractor: Laguna Construction Company
Construction: September, 2000 - November, 2000
Tons Mixed: 35,449
Description: Repair of Primary Spillway  45 feet high 180' wide Horseshoe shaped spillway
Project: Western Ave Dam
Location: Oklahoma City, OK    USA
Owner: City of Oklahoma City
Engineer: Boyle
Contractor: Wynn Construction
Construction: November, 2000 - February, 2001
Tons Mixed: 28,176
Description: RCC was used for the construction of a Flood Control dam in the Canadian River
Project: Jackson Lake Dam Rehabilitation
Location: Jackson, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: BBCM
Contractor: Lodebar
Construction: May, 2001 - May, 2001
Tons Mixed: 7,860
Description: Project consisted of RCC emergency spillway on the downstream slope of the existing Dam
Project: North Fork Hughes River Dam
Location: Harrisville, WV    USA
Owner: Natural Resources Conservation Services
Engineer: Gannett Fleming
Contractor: Barnard
Construction: February, 2001 - August, 2001
Tons Mixed: 189,000
Description: RCC was used for the construction of a new dam and Spillway with precast panels for facing upstream and down stream.
Project: Teter Creek Lake Dam Improvements
Location: Meadowville, WV    USA
Owner: State of WV Division of Natural Resources
Engineer: Civil Tech Engineering, Inc.
Contractor: West Virginia Paving
Construction: July, 2001 - August, 2001
Tons Mixed: 11,405
Description: RCC was used for armoring the emergency spillway plating and weir walls.
Project: Beach Street RCC Low Water Weir
Location: Ft. Worth , TX    USA
Owner: Tarrant Regional Water District
Engineer: Tarrant Regional Water District
Contractor: Craig Olden, Inc.
Construction: September, 2001 - October, 2001
Tons Mixed: 20,164
Description: RCC was used as an instream Dam for grade control of the North Fork Trinity River and creating a small instream Holding Lake.
Project: Skins Lake Spillway Maintenance Project
Location: Burns Lake, BC    CANADA
Owner: Alcan Primary Metal Group
Engineer: Klohn Crippen
Contractor: Skins Lake Contractors LTD
Construction: September, 2001 - November, 2001
Tons Mixed: 49,658
Description: RCC was placed below an existing concrete spillway creating an larger spillway section and protection the existing spillway from erosion.
Project: Vesuvious Lake Dam Rehabilitation
Location: Ironton, OH    USA
Owner: USDA Forest Service
Engineer: USDA Forest Service
Contractor: T-C, Inc.
Construction: October, 2001 - December, 2001
Tons Mixed: 20,423
Description: RCC was mixed for placing on the downstream slope for protection against dam overtopping
Project: Saluda Dam  Remediation Test Section
Location: Lexington, SC    USA
Owner: South Carolina Electric & Gas
Engineer: Paul C. Rizzo Associates
Contractor: Barnard Construction
Construction: November, 2001 - December, 2001
Tons Mixed: 13,267
Description: Project consisted of mixing several mix designs so engineers and contractor could evaluate the RCC that would be used in the Dam project upcoming.
Project: McKinney Lake Dam Rehabilitation
Location: Hoffman, NC    USA
Owner: State of NC Wildlife Resource Commission
Engineer: AG& E Schnabel
Contractor: Atlas Resource Management,Inc.
Construction: November, 2001 - December, 2001
Tons Mixed: 4,064
Description: RCC was placed on the downstream side of the existing dam to create an auxiliary spillway and bring the current dam into compliance with dam safety regulations.
Project: Caldwell  Lake Dam Improvements
Location: Chillicothe, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: Bowser Morner
Contractor: Maiden & Jenkins Construction Co.
Construction: May, 2002 - June, 2002
Tons Mixed: 11,556
Description: RCC was mixed and placed on the downstream side of dam to protect from overtopping and to bring dam into current ODNR safety requirements.
Project: Great Gorge Dam Rehabilitation
Location: Vernon, NJ    USA
Owner: Mountain Creek Resorts
Engineer: Schoor Depalma
Contractor: Van Peenan Contractors, Inc.
Construction: October, 2002 - December, 2002
Tons Mixed: 3,165
Description: PEI inc. crew mixed, placed,formed and compacted RCC on the downstream slope for overtopping protection, bring the Dam into current Dam Safety Standards.
Project: Stonelick Lake Dam Rehabilitation
Location: Goshen, OH    USA
Owner: Ohio Department of Natural Resources
Engineer: Bowser Morner
Contractor: Lodebar
Construction: May, 2003 - June, 2003
Tons Mixed: 8,295
Description: RCC was used for downstream  slope protection to bring the dam into current compliance with Dam Safety requirements
Project: Tanglewood Lake Dam Rehabilitation
Location: Bainbridge Township, OH    USA
Owner: Tanglewood Lake Association
Engineer: BBCM
Contractor: C.J. Natale, Inc.
Construction: July, 2003 - August, 2003
Tons Mixed: 7,548
Description: RCC was placed on the downstream slope of the dam bring the dam into compliance with current dam safety regulations.
Project: Third Avenue Extension
Location: Ketchikan, AK    USA
Owner: Alaska Department of Transportation
Engineer: Alaska Department of Transportation
Contractor: SECON
Construction: May, 2003 - August, 2003
Tons Mixed: 120,460
Description: RCC was used to build a road and stabilize a slope to reroute third avenue around downtown Ketchikan
Project: Willowdale Lake Dam Improvements
Location: North Canton, OH    USA
Owner: Willowdale Lake Road And Bridges Trustees
Engineer: Burgess & Niple
Contractor: Great Lakes Construction Company
Construction: August, 2003 - September, 2003
Tons Mixed: 4,845
Description: Gears, Inc. supplied a plant and operator to mix RCC for bringing the dam up to current compliance standards.
Project: Corral de Palmas Dam
Location: Monterrey, NL    MEXICO
Owner: Nuevo Leon State Government
Engineer: Ernie Schrader
Contractor: DYCUSA
Construction: March, 2003 - March, 2004
Tons Mixed: 929,416
Description: Gears, Inc. supplied a mixing plant and Technician for mixing RCC on this Flood Control Dam
Project: Big Sandy Saddle Dam
Location: Louisa, KY    USA
Owner: American Electric Power
Engineer: United Construction Company
Contractor: United Construction Company, Inc.
Construction: October, 2004 - November, 2004
Tons Mixed: 4,368
Description: Gears, Inc. mixed RCC for a Spillway plug in order to raise the crest of the Power plants Holding pond.
Project: Brunswick Lake Dam Improvements
Location: Brunswick, OH    USA
Owner: City of Brunswick
Engineer: MS Consultants
Contractor: Lodebar
Construction: November, 2004 - November, 2004
Tons Mixed: 4,636
Description: Gears mixed RCC to be placed on the down stream slope of the dam for an overtopping protection. to Bring dam into compliance with current Dam Safety requirements.
Project: New Big Cherry Dam
Location: Big Stone Gap, VA    USA
Owner: Town Of Big Stone Gap
Engineer: GEI
Contractor: Estes Brothers Construction, Inc.
Construction: July, 2004 - January, 2005
Tons Mixed: 27,772
Description: A new RCC dam built downstream of an existing high hazard dam increasing reservoir capacity and safety of down stream residents.
Project: Lyman Run State Park Dam
Location: Galeton, PA    USA
Owner: PA Department of General Services
Engineer: Gannett Fleming, Inc.
Contractor: Peltz
Construction: May, 2005 - July, 2005
Tons Mixed: 33,696
Description: Reconstruction of a 50' High, 1200' long earth-fill dam with RCC Spillway.
Project: Locust Lake Dam Rehabilitation
Location: Hope Township, NJ    USA
Owner: John P. deNuefville
Engineer: French & Perillo
Contractor: GEARS, INC.
Construction: June, 2005 - September, 2005
Tons Mixed: 3,210
Description: Project will bring the dam into compliance with State dam safety regulations.
Project: Glendale Landfill Levee
Location: Glendale, AZ    USA
Owner: City of Glendale
Engineer: City of Glendale
Contractor: Valley Rain Construction
Construction: December, 2005 - January, 2006
Tons Mixed: 88,912
Description: Cement Stabilized Allivium Levee constructed along the bank of the Agua Fria River for flood protection
Project: Taum Sauk Dam Test Section
Location: Annapolis, MO    USA
Owner: AMEREN UE
Engineer: Paul C. Rizzo Associates
Contractor: Dave Kolb Grading
Construction: November, 2006 - December, 2006
Tons Mixed: 2,500
Description: Construction of a 3,000 cy RCC test Program to evaluate Mixes for a Full Scale RCC dam to be constructed in the near future.
Project: Century Steel Facility
Location: Henderson, NV    USA
Owner: Century Steel
Engineer:
Contractor: American Asphalt & Grading
Construction: March, 2007 - May, 2007
Tons Mixed: 35,311
Description: 20,000 cy of RCC paving.
Project: Upper and Lower Aetna Dams
Location: Medford LAkes, NJ    USA
Owner: Bourough of Medford LAkes
Engineer: Dewberry-Goodkind, Inc.
Contractor: Northeast Remsco, Inc.
Construction: February, 2007 - July, 2007
Tons Mixed: 21,329
Description: Construction of two new RCC dams to replace the earthen dams that were breached during the flood of July 12, 2004
Project: Elkwater Fork Water Supply Dam
Location: Huttonsville, WV    USA
Owner: NRCS
Engineer: Gannett Fleming
Contractor: HEETER Construction
Construction: March, 2007 - August, 2007
Tons Mixed: 293,076
Description: Constructing a 132,000 CY RCC DAM for Water Supply in Randolph County, WV
Project: Marilla Dam #3
Location: Bradford, PA    USA
Owner: Bradford City Water Authority
Engineer: GAI
Contractor: Bob Cummins Construction
Construction: September, 2007 - October, 2007
Tons Mixed: 20,209
Description: 8500 cy rcc overtopping protection on existing dam.
Project: Deegan & Hinkle Dams
Location: Bridgeport, WV    USA
Owner: City of Bridgeport
Engineer: Civil Tech Engineering Inc.
Contractor: Kanawha Stone
Construction: October, 2007 - November, 2007
Tons Mixed: 9,172
Description: RCC was placed on the downstream slopes of 2 existing dams for overtopping protection.
Project: Sally's Pond
Location: Ringwood, NJ, NJ    USA
Owner: NJ-DPMC
Engineer: Schnabel Engineering
Contractor: Petillo Inc.
Construction: April, 2008 - April, 2008
Tons Mixed: 5,032
Description: 2500 CY of RCC to reconstruct a small dam within the Ringwood State park.
Project: Mt Storm Flip bucket
Location: Mt Storm, WV    USA
Owner: Dominion Resources
Engineer: Civil Tech Engineering
Contractor: Kanawha Stone Company.
Construction: August, 2008 - September, 2008
Tons Mixed: 4,356
Description: 1750 Cy of RCC was mixed and placed to rehabilitate an existing spillway.
Project: Poe Valley Dam Rehabilitation
Location: Poe Valley State park, PA    USA
Owner: Commonwealth of Pennsylvania DGS
Engineer: Schnabel Engineering
Contractor: Jay Fulkroad & Sons, Inc.
Construction: September, 2008 - November, 2008
Tons Mixed: 20,981
Description: RCC was mixed and placed on the downstream side of an existing dam for overtopping protection
Project: NE C-1 Detention Basin
Location: Henderson, NV, NV    USA
Owner: City of Henderson- lance Olsen P.E.
Engineer:
Contractor: American Asphalt and Grading
Construction: November, 2009 - February, 2010
Tons Mixed: 24,423
Description: Gears, Inc  mixed 12,000 CY of Roller Compacted Concrete used for bank protection and flood control
Project: Capay Dam Project
Location: Capay, CA    USA
Owner: Yolo County Flood Control District
Engineer: Stantec Consulting, Inc.
Contractor: Steelhead Constructors Inc.
Construction: October, 2010 - November, 2010
Tons Mixed: 10,800
Description: 5,200 to 5,500 CY of RCC
Project: Las Animas Diversion Dam Project
Location: La Junta, CO    USA
Owner: Xcel Energy
Engineer: W.W. Wheeler
Contractor: Gears, Inc.
Construction: December, 2010 - March, 2011
Tons Mixed: 6,908
Description: 2,810 CY RCC for Diversion Dam Repairs
Project: Los Vaqueros Reservoir Expansion Project
Location: Brentwood, CA    USA
Owner: Contra Costa Water District
Engineer: URS Corporation
Contractor: Barnard Construction Company, Inc.
Construction: June, 2011 - September, 2011
Tons Mixed: 82,512
Description: Project involves mixing approx 40,000CY of Roller Compacted Concrete for retrofitting existing dam with a new spillway.
Project: Bear Creek Reservoir Improvement Project
Location: Wise, VA    USA
Owner: Wise COunty
Engineer: Thompson & Litton & Schnabel Engineering
Contractor: ESTES BROTHERS
Construction: March, 2012 - April, 2012
Tons Mixed: 11,215
Description: Mixing and Supervision of the installation of a 5,000CY RCC Over topping protection
on the existing Bear Creek Reservoir Dam.
Project: Lower Owl Creek Dam Rehab
Location: Tamaqua, PA    USA
Owner: Borough of Tamaqua
Engineer: Schnabel Engineering
Contractor: Performance Construction Services, Inc.
Construction: September, 2012 - October, 2012
Tons Mixed: 8,756
Description: MIxing and Supervision of approx 3,000CY of RCC overtopping on an existing dam.
Project: Berwind Dam Modification
Location: War, WV    USA
Owner: Berwind Wildlife Management Area
Engineer: Civil Tech Enineering
Contractor: Green Mountain Company
Construction: October, 2012 - November, 2012
Tons Mixed: 5,250
Description: MIxed and Supervised the installation of 2500 CY of RCC overtopping with keyway trenches on an existing Dam.For Upgrading
Project: Caney- Coon Site 2 Dam Rehabilitation
Location: Coalgate, OK    USA
Owner: State of Oklahoma DCS
Engineer: State of Oklahoma NRCS
Contractor: WYNN Construction Company
Construction: November, 2012 - February, 2013
Tons Mixed: 21,838
Description: Mixing approx 8750 CY of RCC for the rehabilitation of an existing dam 
Project: Sallisaw Creek Site 26 DAm Rehabilitation
Location: Greasy, OK    USA
Owner: State of Oklahoma
Engineer: State of Oklahoma- NRCS
Contractor: WYNN Construction
Construction: March, 2013 - May, 2013
Tons Mixed: 20,407
Description: Mixing of 7558 CY of RCC for the over topping auxiliary spillway on an existing watershed dam.
Project: ADM Intermodal Facility
Location: Decatur, IL    USA
Owner: ADM
Engineer:
Contractor: Calumet Civil Contractors
Construction: May, 2013 - June, 2013
Tons Mixed: 35,764
Description: Gears, Inc mixed 10,000 CY of RCC Paving for phase 1 of ADM Intermodal facility in Decatur ILL
Project: Roosevelt and Pond Lick Dam
Location: West Portsmouth, OH    USA
Owner: ODNR
Engineer: ODNR     614-265-6948
Contractor: Sunesis Construction
Construction: August, 2014 - September, 2014
Tons Mixed: 18,493
Description: Gears, Inc supplied a mixing plant operator and RCC Supervisor to assist in the installation of 11,000CY on two existing dams in the Shawnee State Forest
Project: Pike Lake State Park
Location: Bainbridge, OH    USA
Owner: ODNR
Engineer: Michael Baker Jr , Inc.
Contractor: Trucco Construction
Construction: August, 2014 - September, 2014
Tons Mixed: 13,782
Description: Gears, Inc supplied a mixing plant with operator and RCC Supervisor to assist in the installation of 7000CY of Roller Compacted Concrete. 
Project: Cherokee Dam RCC Permanent Modification
Location: Jefferson City, TN    USA
Owner: TVA
Engineer: TVA  --Will Coker Contracting Officer
Contractor: Phillips  and Jordan
Construction: August, 2014 - February, 2015
Tons Mixed: 46,776
Description: MIxing 20,000CY of RCC for overtopping protection on an existing TVA dam
Project: SANTA ANA DETENTION DAM
Location: BERNALILLO, NM    USA
Owner: PUEBLO OF SANTA ANA, NM
Engineer: Kleinfelder
Contractor: RMCI, INC.
Construction: November, 2014 - March, 2015
Tons Mixed: 20,600
Description: 4,800 CY Soil Cement
5,500 CY RCC
Project: Colyer Dam
Location: Centre Hall, PA    USA
Owner: PA Fish and Boat Commision &  DGS
Engineer: Schnabel Engineering
Contractor: Performance Construction services
Construction: July, 2015 - August, 2015
Tons Mixed: 24,150
Description: Gears, Inc Supplied mixing plant and Supervision for RCC Installation.
11,500 CY RCC for overtopping protection
Project: Bradford Dam  NO 2
Location: Bradford, PA    USA
Owner: City of Bradford
Engineer: GAI Consultants, Inc.
Contractor: Bob Cummins Construction Co
Construction: August, 2015 - October, 2015
Tons Mixed: 29,998
Description: 13,500CY of RCC for overtopping protection
Project: CACAPON STATE PARK DAM PROJECT
Location: Berkeley Springs, WV    USA
Owner: WV DNR
Engineer: Civil Tech Engineering
Contractor: Heeter Construction
Construction: November, 2016 - December, 2016
Tons Mixed: 6,248
Description: RCC for Over topping Protection for two dams
Project: Lake White Dam SR 104
Location: Waverly, OH    USA
Owner: ODOT and ODNR
Engineer: Stantec / Klienfelder
Contractor: Sunesis
Construction: March, 2016 - , 
Tons Mixed: 231,000
Description: Gears,Inc  supplied a Mixing Plant, Plant operator and RCC Placement Supervisor to install 103,000CY of RCC on the downstream side of an existing dam/Road

Older Projects ->