Gears, Inc and PEI have been involved in the following projects that utilized soil cement totaling over 1,000,000 tons of mixed soil cement since 1989.

Project: Gila River Spur Dike
Location: Chandler, AZ    USA
Owner: Arizona Department of Transportation
Engineer: ADOT
Contractor: J. Banicki Construction
Construction: August, 1999 - August, 1999
Tons Mixed: 7,458
Description: Mixed soil cement for placing alone the banks of the Gila River  in Chandler Arizona
Project: Fountain Creek Trail Repairs
Location: Colorado Springs, CO    USA
Owner: ElPaso County Parks
Engineer: Kiowa Engineering
Contractor: Spaccamonti Excavating
Construction: February, 2000 - March, 2000
Tons Mixed: 14,629
Description: Soil Cement was placed along the banks of Fountain creek in three different places to repair the erosion from extreme flooding
Project: Sand Creek Trail Improvements
Location: Aurora, CO    USA
Owner: City of Aurora
Engineer: Wenk & Associates
Contractor: L & M Enterprises
Construction: July, 2000 - August, 2000
Tons Mixed: 2,987
Description: Project consisted of mixing and placing Soil Cement for a retaining wall
Project: Rio Bravo West Extension
Location: Albuquerque, NM    USA
Owner: Bernalillo County Public Works
Engineer: Gannett Fleming West
Contractor: Albuquerque Underground
Construction: July, 2000 - August, 2000
Tons Mixed: 9,730
Description: Soil Cement was mixed to line the drainage ditch along the side of a new road
Project: Borega Detention Basin
Location: Albuquerque, NM    USA
Owner: AMAFCA
Engineer: Wilson & Associates
Contractor: Chava Trucking
Construction: July, 2000 - September, 2000
Tons Mixed: 9,020
Description: Project armored a spillway with soil cement and access roads into the detention basin
Project: Marcy Gulch Channel Stabilization PH I
Location: Highlands Ranch, CO    USA
Owner: Highlands Ranch Metro District
Engineer: Muller
Contractor: L& M Contruction
Construction: November, 2000 - January, 2001
Tons Mixed: 5,610
Description: Project consisted of four structures  three drop structures and one bank protection for a test phase of the larger project.
Project: Marcy Gulch Channel Stabilization PH II
Location: Highlands Ranch, CO    USA
Owner: Highlands Ranch Metro District
Engineer: Muller Engineering
Contractor: New Design Construction
Construction: November, 2001 - January, 2002
Tons Mixed: 19,036
Description: Soil Cement was used for 15 small in channel drop structures for erosion control and bank stabilization
Project: Sand Creek Detention Pond #1
Location: Colorado Springs, CO    USA
Owner: BRE Springs Ranch
Engineer: Kiowa Engineering
Contractor: Rice & Rice
Construction: February, 2003 - April, 2003
Tons Mixed: 33,867
Description: Material was used to line the inside of the slopes in a new detention basin for future developments.
Project: Zone 7 Reservoir
Location: Scottsdale, AZ    USA
Owner: DC Ranch
Engineer: 0
Contractor: Currier Construction
Construction: March, 2003 - May, 2003
Tons Mixed: 27,842
Description: Mixed Soil cement for the base of a new concrete reservoir
Project: North Transfer Station Access Road
Location: Phoenix, AZ    USA
Owner: City of Phoenix
Engineer: MACTEC
Contractor: AMES Construction
Construction: February, 2004 - April, 2004
Tons Mixed: 23,875
Description: Mixed soil cement for shoulder protection on new road plus stabilized sub base.
Project: USAFA Non-Pot #3
Location: Colorado Springs, CO    USA
Owner: United States Air Force Academy
Engineer: S.A. Miro
Contractor: Laguna Construction Company, LLC.
Construction: June, 2004 - July, 2004
Tons Mixed: 8,285
Description: Project relined the inside slope of an existing reservoir after the outlet works were repaired and the earth dam was replaced
Project: Tampa Bay Regional Reservoir
Location: Lithia, FL    USA
Owner: Tampa Bay Water
Engineer: HDR
Contractor: Barnard Construction
Construction: September, 2003 - December, 2004
Tons Mixed: 623,525
Description: Two plants mixed soil cement being plated on the slope of a new reservoir.
Project: Everglades Test Section
Location: Southbay, FL    USA
Owner: USACOE
Engineer: USACOE
Contractor: Barnard Construction
Construction: April, 2005 - April, 2005
Tons Mixed: 1,196
Description: Testing plant capacity with onsite material part of a possible larger job
Project: Deer Valley Road 
Location: Phoenix, AZ    USA
Owner: City of Phoenix
Engineer: City of Phoenix
Contractor: FNF Construction
Construction: June, 2006 - June, 2006
Tons Mixed: 7,737
Description: Mixed Soil Cement to be used for Bank Protection around bridge abutments.
Project: San Xavier Farm Rehabilitation
Location: Tucson, AZ    USA
Owner: Bureau of Reclamation
Engineer: Bureau of Reclamation
Contractor: Barnard Construction Company
Construction: May, 2006 - July, 2006
Tons Mixed: 35,800
Description: Project consists of a Soil cement Flood Control Dam and several bank protection structures with channel crossings.
Project: Westlake Reservoir
Location: Thousand Oaks, CA    USA
Owner: Calleguas Municipal Water District
Engineer: Perliter & Ingalsbe Consulting Engineers
Contractor: Kiewit Pacific
Construction: October, 2006 - October, 2006
Tons Mixed: 22,038
Description: A low strength Soil Cement mixed for a Base for a new reservoir
Project: Rueter-Hess Dam
Location: Parker, CO    USA
Owner: Parker Water and Sanitation
Engineer: GEI/ RJH
Contractor: SEMA Construction
Construction: August, 2006 - November, 2006
Tons Mixed: 125,750
Description: Gears, Inc mixed, and placed approx 80,000cy of Soil Cement for upstream slope protection using the Plating and Stair Step methods on 4.25:1 slopes and 3:1 slopes.
Project: Deer Valley Road Phase II
Location: Phoenix, AZ    USA
Owner: City of Phoenix
Engineer: City of Phoenix
Contractor: FNF Construction, Inc.
Construction: February, 2007 - February, 2007
Tons Mixed: 5,486
Description: Soil Cement being mixed for use around Bridge abutments
Project: F-4 basin and channel
Location: Las Vegas, NV    USA
Owner: Army Corp of Engineers
Engineer: Army Corp of Engineers
Contractor: American Asphalt and Grading, Co
Construction: January, 2007 - July, 2007
Tons Mixed: 16,812
Description: Soil cement used for bank protection along flood channel
Project: SR 101 Scottsdale road to Haydon Rd
Location: Scottsdale, AZ    USA
Owner: Arizona Department of Transportation
Engineer: ADOT
Contractor: Achen-Gardner
Construction: November, 2007 - January, 2008
Tons Mixed: 11,401
Description: 7900 CY of Soil Cement for Bank Protection
Project: Camelback & 107th ave
Location: Phoenix, AZ    USA
Owner: City of Phoenix
Engineer: City of Phoenix
Contractor: ACHEN-GARDNER
Construction: January, 2007 - February, 2008
Tons Mixed: 4,396
Description: 2400 CY Soil Cement for Bank protection
Project: EAA TEST SECTION  PHASE II
Location: SOUTH BAY, FL    USA
Owner: South Florida Water MAnagement District
Engineer: Black & Veatch
Contractor: BARNARD PARSONS CONSTRUCTION
Construction: February, 2008 - March, 2008
Tons Mixed: 4,221
Description: Soil Cement test section  constructed to evaluate various mix designs which would be used to line the slopes A-1 Reservoir and canal 
Project: Prairie Waters Project
Location: Aurora, CO    USA
Owner: Aurora Water
Engineer: CH2MHill
Contractor: Western Summit Constructors Inc.
Construction: July, 2008 - October, 2008
Tons Mixed: 50,975
Description: Gears, Inc mixed and placed soil cement to line the bottom and slopes of five water retention ponds at the Aurora Reservoir Water treatment plant.
Project: Shooters Park
Location:  North LAs Vegas, NV    USA
Owner: Clark County PArk And Recreation
Engineer: Poggemeyer Design Group
Contractor: American Asphalt & Grading
Construction: November, 2008 - July, 2009
Tons Mixed: 138,929
Description: Bank Protection on a flood control channel for a new Shooting Park in North Las Vegas.PLus mix a low strength material for a Back Stop at the shooting range.
Project: Prairie Waters Project
Location: Aurora, CO    USA
Owner: Aurora Water
Engineer: CH2MHill
Contractor: Western Summit Constructors, Inc.
Construction: July, 2009 - July, 2009
Tons Mixed: 16,142
Description: Gears, Inc mixed and placed soil cement to line the bottoms and slopes of five holding ponds at the Prairie waters / Aurora reservoir water treatment plant.
Project: South Fork Arroyo
Location: Las Cruces, NM    USA
Owner: City of Las Cruces
Engineer: ZIA Engineering- 575-532-1526
Contractor: Rummel Construction
Construction: July, 2010 - August, 2010
Tons Mixed: 5,837
Description: GEARS, INC mixed 3600 CY of Soil Cement for bank protection for the city of Las Cruces, NM
Project: Rainbow Canyon Road NDOT 3395
Location: Elgin- Caliente, NV    USA
Owner: Nevada Department of Transportation
Engineer: NDOT
Contractor: Rafael Civil Construction/ Sub to Southwest Iron
Construction: May, 2010 - September, 2010
Tons Mixed: 87,193
Description: Gears, Inc mixed approx 50,000CY of soil cement to rebuild the washed out  portions of SR 317 between Elgin, NV and  Caliente, NV
Project: Peoria Avenue River Path
Location: Peoria, AZ    USA
Owner: City of Peoria
Engineer: City of Peoria
Contractor: Valley Rain Construction
Construction: September, 2010 - September, 2010
Tons Mixed: 9,435
Description: Gears, Inc will mix approx 11,000 tons of Soil Cement for bridge support protection.
Project: Navajo Generating Station
Location: Page, AZ    USA
Owner: Salt River Project SRP
Engineer: Stantec Engineers
Contractor: Blount Contracting
Construction: August, 2010 - October, 2010
Tons Mixed: 31,532
Description: Gears, inc mixed approx 19,000CY of blended soil and cement for Slope protection on new power plant evaporating ponds
Project: Barr Lake Dam Project
Location: Brighton, CO    USA
Owner: FRICO
Engineer: ERC
Contractor: Tezak Heavy Equipment, Inc.
Construction: October, 2010 - November, 2010
Tons Mixed: 10,788
Description: 5,900 CY of Soil Cement placed in the Spillway
Project: Regional WWTP PH I Improvement 
Location: Columbia, MO    USA
Owner: City of Columbia
Engineer: Black & Veath
Contractor: Columbia Curb and Gutter, Inc./KCI
Construction: November, 2010 - March, 2011
Tons Mixed: 26,770
Description: Gears mixed approx 28,000 tons of Soil cement to stabilize an embankment along a river drainage to support a new expansion to the existing Waster Water treatment plant
Project: Camino Del Llano Project
Location: Belen, NM    
Owner: City of Belen, New Mexico
Engineer: U.S. Army Corp. of Engineers
Contractor: TLC Plumbing & Utility
Construction: April, 2011 - May, 2011
Tons Mixed: 7,277
Description: MIxed 3121 tons of Soil Cement for new road shoulder erosion control..
Project: Navajo Generating Station Ph II
Location: Page, AZ    USA
Owner: Salt River Project NGS
Engineer: Stantec Engineers
Contractor: Blount Contracting
Construction: July, 2011 - July, 2011
Tons Mixed: 4,090
Description: Bank protection for New Evaporation ponds
at the Navajo Generating Station
Project: Site 1 Impoundment 
Location: Boca Raton, FL    USA
Owner: SFWWD - ACOE
Engineer: Army Corp of Engineers
Contractor: LODGE Construction
Construction: January, 2011 - August, 2012
Tons Mixed: 35,000
Description: Consulting on the mixing and placement of approx 68,200 CY of Soil Cement Bank protection to line the interior of a rebuilt levee so it can be used as a water impoundment  Phase I of II new water reservoir.
Project: La Cholla Blvd Magee Rd to Overton Rd
Location: Tucson, AZ    USA
Owner: Pima County
Engineer: URS
Contractor: Markham Contracting
Construction: September, 2012 - October, 2012
Tons Mixed: 9,731
Description: Mixing approx 5000 cy of 10,000CY total  soil cement for shoulder erosion control.
Project: Navajo Generating Station Ph III
Location: Page, AZ    USA
Owner: Salt River Project
Engineer: Stantec Engineers
Contractor: Blount Contracting
Construction: September, 2012 - October, 2012
Tons Mixed: 17,287
Description: Mixing approx 5200 CY of Soil Cement for lining the banks of the new evaporation ponds on the  Navajo Generating Station Power Plant.
Project: La Cholla Blvd Magee Rd to Overton Rd
Location: Tucson, AZ    USA
Owner: Pima County
Engineer: URS
Contractor: Markham Contracting
Construction: March, 2013 - March, 2013
Tons Mixed: 25,223
Description: Mixing approx 7000 cy of 11,000CY total  soil cement for shoulder erosion control.
Project: Boca Negra Detention Dam
Location: Albuquerque, NM    USA
Owner: A.M.A.F.C.A.
Engineer: Wilson And Associates
Contractor: Salls Brothers, Inc.
Construction: August, 2013 - September, 2013
Tons Mixed: 11,057
Description: Gears, Inc supplied a mixing plant for mixing soil cement used for bank protection on a detention dam. near Rio Rancho, NM
Project: RAWHIDE Wash Channel
Location: Scottsdale, AZ    USA
Owner: Wood/Patel 
Engineer: Ninyo Moore
Contractor: Hunter Contracting
Construction: October, 2013 - January, 2014
Tons Mixed: 55,616
Description: Mixing approx 15,900 CY of Soil Cement for bank protection, erosion control
Project: Tampa Bay Regional Reservoir
Location: Lithia, FL    USA
Owner: Tampa Bay Water Authority
Engineer: Gannett Fleming/ CH2MHill
Contractor: Kiewit Infrastructure South
Construction: September, 2013 - March, 2014
Tons Mixed: 168,211
Description: Gears, Inc supplied a mixing plant to assist in the mixing of soil cement to line the interior of the reservoir
Project: Lomitas - Negras Water Quality Facility
Location: Rio Rancho, NM    USA
Owner: Southern Sandoval County Arroyo Flood Control Authority Flood Contr
Engineer: Smith Engineering
Contractor: SALLS Brothers
Construction: April, 2014 - May, 2014
Tons Mixed: 8,370
Description: Mixing 5500 CY of Soil Cement for four drop structures and raised existing levee two feet .
Project: Tampa Bay Regional Reservoir
Location: Lithia, FL    USA
Owner: Tampa Bay Water Authority
Engineer: Gannett Fleming/ CH2MHill
Contractor: Kiewit Infrastructure South
Construction: October, 2013 - June, 2014
Tons Mixed: 192,389
Description: Mixing soil cement for the lining of the existing reservoir- rebuilding C.W. Bill Young Reservoir.
Second Plant
Project: New River Multi Use PAthway
Location: Glendale, AZ    USA
Owner: AZDOT/ City of Glendale
Engineer: AZDOT
Contractor: Standard Construction
Construction: August, 2014 - November, 2014
Tons Mixed: 27,575
Description: Mixing approx 30,000 tons of soil cement for use as Bank protection and Future pedestrian Pathway along New River Wash in Glendale AZ
Project: Sand Creek Detention Basin #3 
Location: Colorado Springs, CO    USA
Owner: City of Colorado Springs
Engineer: Kiowa Engineering/ M& S Consultants
Contractor: TEZAK Heavy Equipment, Inc. (T.H.E.)
Construction: March, 2016 - May, 2016
Tons Mixed: 28,095
Description: Mixing soil cement for a 10500CY Soil Cement Berm and a 3,500CY in channel Drop Structure
Project: Upper SLO Dam
Location: Rio Rancho, NM    USA
Owner: SSCAFCA
Engineer: SMITH Engineering 505-884-0700
Contractor: RMCI
Construction: March, 2016 - June, 2016
Tons Mixed: 9,947
Description: MIxing approx 4800 CY of Soil cement for one inlet and one outlet structure for a new flood control detention dam. 
Project: Red Rock Solar
Location: Red Rock, AZ    USA
Owner: Arizona Public Service
Engineer: Arizona Public Service
Contractor: Blount Contracting, Inc.
Construction: September, 2016 - September, 2016
Tons Mixed: 10,517
Description: Mix soil cement to line storm water ditches at solar farm for APS.
Project: Tributary 4
Location: Colorado Springs, CO    USA
Owner: City of Colorado Springs
Engineer: Kiowa Engineering
Contractor: Dwire Earthmoving
Construction: October, 2016 - December, 2016
Tons Mixed: 28,146
Description: 15,000 CY of Soil Cement for Drop Structures Using 14 and 16% cement content and native soil